Residential building "Paris", once the former Grand Hotel "Paris" is located on the corner of 57, Preslav Street and 1, Panagyurishte Street in the city center of Varna. The building is included in the list of architectural and construction real estate with cultural value, according to Order № RDO9-221 / 13.04.2017 of the Minister of Culture.
Historical background
The building was constructed in 1906 by Riza Efendi Halilov, from Belogradets (north-eastern Bulgaria), at that time, mayor of the town of Varna. The architect of the building was arch. G. Gerov. The building was originally designed as a luxury hotel for its time in the city center, on 2 floors plus an attic. The exterior architecture of the building was according to the modern at that time trends in architecture. The mixture of western secession and other oriental motifs and traditions in the construction, created a significant eclectic architectural style.The building became a center place for a large part of the intellectual elite of the city.
In 1910, an incident caused a fire in the attic and the whole floor was burned, as well as parts of the second. The restoration of the building was assigned to the iconic for the city arch. Dabko Dabkov. The drawings for the upgrading of the building are preserved in the archives of the Municipality of Varna. The project was approved on December 21, 1910. The project includes renovation of the second floor and construction of a third. Arch. Dabko Dabkov also made changes in the facade decoration.
In the past, The Grand Hotel Paris was one of the most beautiful buildings in the city. On the ground floor was the hotel lobby and Dairy "Paris" owned by Mr. Karaatanasov, as well as a covered bazaar owned by Mr. Todor Gerchev. Alliance Française was established here, and in the 1930s Dimitar Marinov's most renowned Confectionery “Paris” was opened here.
Urban planning solution
The project envisages construction of a residential building, designed on six above-ground floors. The car access to the garage of the building is from the Panagyurishte Street (western facade), by means of a ramp. The project preserves the overall exterior architectural appearance of the existing building, by replacing, reconstructing and restoring all architectural decorative elements, similar to the preserved ones. The southern façade, at the back of the old one is with a contemporary design. The back entrance to the building borders with a municipal garden, providing more spacious view from windows and balconies at the south-eastern facade.
Finishing of the apartments:
1. Walls: machine-applied gypsum plaster.
2. Floor: leveled cement screed, ready for laying flooring.
3. Ceiling: machine-applied gypsum plaster.
4. Sanitary premises: floor - cement screed, walls - machine-applied lime-cement plaster, prepared for laying faience and terracotta.
5. Terrace / balcony: cement screed with slope for drainage, waterproofing, laid granite as per approved technical project - part Architecture.
6. Joinery: Aluminum joinery system VIVA Aluminum TBO 70. Color of the profiles - white. Triple glazing: 48 mm – outer - 4 mm four-season glass / Argon 90% /; medium - 4 mm white glass / Argon 90% /; inner- 4 mm low emission glass.
7. External window sills.
8. Entrance door - reinforced;
9. Threshold of the front/entrance door - granite;
10. Interior doors: MDF.
11. El. and low-current installations for internet, television and intercom - implemented according to an approved technical project, with power supply for air conditioners, charged switches and sockets, lighting - sockets, installed apartment electrical panels with the necessary fitting by technical project.
12. Installation for security system.
13. Front door bell system;
14. Plumbing installations: polypropylene, executed according to approved technical project- part Plumbing: in the bathroom, WC, closet and kitchen - to the stopper, with installed water meters.
15. Ventilation - executed according to an approved technical project part: HVAC.
16. Air conditioning: laid installation for air conditioners - pipeline and drainage - condensation.
17. Lighting on the terrace/balcony.
Underground parking. Single and duplex parking places by means of a swiss platform:
1. Walls and ceiling: concrete, el. installation and lighting installation.
2. Flooring: polymeric floor – durable to oil-based products.
3. LED lightening + sensor for movement-parking and maneuvering area.
4. Emergency lights pointing to emergency exits, according to the technical design.
5. Indication signs, fire-safety measures, according to the technical design.
Building:
1. Monolith construction - reinforced concrete structure.
2. Ceramic blocks Winerberger
3. Roof-polymer membrane
4. Thermal insulation – roof EPS, according to the technical design, XPS 10cm facade + silicate layer.
5. External window sill.
6. Balconies/Terraces-stone. External railing.
7. Facade lighting, according to the design project.
8. Landscaping, according to the technical design.
9. Vertical layout, according to the technical design.
Common parts:
1. Intercom - with access control at the entrance gate of the building.
2. Window frames common parts: six-chamber PVC joinery, white colour, glazing - energy /four seasonal.
3. Electrical lift.
4. Post boxes at the entrance of the buildings.
5. Machine-laid plaster- walls.
6. Machine-laid plaster or gypsum plaster - ceilings.
7. Gypsum plaster -walls and ceilings.
8. Colour, as per the design project, walls and ceilings.
9. Cement flooring-floors.
10. Flooring of staircases and grounds.
11. Electric and energy saving LED lightening, according to the design project plus staircase switches and electrical meter for common parts.
12. Low-current electric lines available for TV and Internet connections.
13. Video surveillance of the common parts and the periphery of the complex.
14. Emergency lighting.
15. Internal railings.
16. Pedestrian entrance to the underground parking – fire safety doors.
17. Vehicle entrance to the underground parking -electric sectional door.
18. Ventilation system in the underground parking, according to the technical design.
19. The main electric display fully equipped with electrical meters and clock mechanism.
20. Central connection to external El. and Water and Sewage -fully finished, with usage permission.